Before Anyone Selects a Pump: Five Questions That Shape the Entire Station

A pumping project can appear easy on paper. Water is introduced at one point and is required to move to another. In practice, distances between these two points may be influenced by elevation changes in the area, pressure requirements and solids, as well as storage capacity, control, electrical equipment, restrictions on site and fluctuations in the flow rate.

Image credit: romtecutilities.com

Romtec Utilities begin the development of the pumping station by defining these operational conditions, rather than selecting the equipment from catalogues. The preliminary designs and budgetary data can be created based on the requirements of the project.

Think about where do we go?

The solution immediately alters the technology.

There are significant variations in the flow rate of wastewater that is used for domestic use. If gravity conveyance fails, or is not enough, a wastewater lift station is required to transport the wastewater. Engineers must consider the expected inflow and maximum conditions, pumping capacities, wet-well behaviour, discharge specifications, and how equipment will be maintained and operated.

Industrial water presents different challenges. A manufacturing or processing facility could require moving high-temperature, caustic or oily or high-pressure liquids. Romtec Utilities designs systems for industrial applications that range from food processing and power generation to databases, pharmaceutical waste, oil and gasoline facilities.

Rainfall creates a completely different operating system

Stormwater systems are usually inactive for prolonged periods of time and then suddenly face the possibility of a huge volume in the course of a storm.

A stormwater lift station associated with a detention basin, for example, must work with the site’s larger drainage strategy. Runoff enters a basin. Temporary storage regulates the amount immediately. A pumping system transports the water that is collected to a designated outlet.

Romtec Utilities offered this type of solution to an Norco, California business park. The plan called for the construction of a pumping station that would empty a detention facility into the public stormwater drainage system. The station was intended to work as part of the drainage system for a particular development rather than an individual part of the equipment.

“Package” Doesn’t Need to be Off-the-Shelf

A lot of people think that a package-pumping system is simply a predetermined set of components.

In the case of engineered infrastructure, packaging could mean that all major components are coordinated into one system. Meters, valves, pumps and controls, communications structural elements, and more equipment may be chosen based on the required duty conditions.

This method is especially beneficial when a brand new system needs to be connected to existing infrastructure. Industrial plants and existing municipal facilities might not have a lot of space to install or maintain clear conditions. It may be necessary to adjust equipment around existing structures, piping or electrical systems as well as schedules.

Capacity planning has real implications

The cost of undersizing increases as the facility expands.

Romtec Utilities supplied a sewer lift station in Portland International Airport for the PDX Next extension. The new station was required to be designed to accommodate twice the capacity for peak flow because the airport has grown.

This illustration illustrates an important engineering concept: Design conditions are not limited to what a facility can be able to handle during a typical afternoon. Engineers must know what happens during peak demand.

The job isn’t done until the Equipment arrives

Drawings and calculations eventually become an operating system. Installation coordination, startup and testing, documentation, and operator comprehension are all essential for long-term efficiency.

What happens after the building of a pumping unit determines its performance. When flows increase or a storm of major magnitude arrives or equipment requires repair The decisions made during preliminary design are evident.

Romtec Utilities blends these choices in order to develop a complete pumps solution for a specific project. It can help turn equipment into infrastructure specially designed to meet the specific conditions in which it will be used.