A city might have an ambitious plan to create a new recreation facility However, turning that vision into a completed park requires a less thrilling design inspiration: reliable project information. Before the construction process can begin, officials need to know the costs realistically, landscape architects need construction specifications and contractors need plans that they can use to estimate.

If these pieces arrive late, even the most well-designed projects may be affected by budget issues, delays in the procurement or even revisions. Selecting a trusted supplier and designer early on can be a major factor in the planning of restrooms for public use.

Image credit: romtec.com

The first drawing is required to pay for construction, but not for building.

Many of the public recreation programs begin prior to the time that the construction budget is approved. A park department might be preparing a grant request and a capital improvements plan or requesting approval from local officials. A concept building design and a credible estimate of the cost can help decision-makers to know what’s involved in the proposed facility.

Romtec assists owners in these early planning stages by supplying preliminary designs and estimates at no cost. The team members of the project are able to explore various building configurations along with construction techniques, materials, and other options before making a final decision.

Creative Freedom Needs Technical Assistance

Landscape architects desire park buildings which are aesthetically pleasing, instead of appearing like generic structures used for utilities. A recreation area with a waterfront may require unique exterior finishes, while communities sporting facilities may require coordinated restrooms, concession facilities, and shelters.

Finding the best park building designer for these projects means looking beyond attractive renderings.

The designer or building partner must also understand construction methods and layouts that are accessible, materials availability, and applicable building regulations. Romtec collaborates with landscape architects by providing expert knowledge in the field of design-build, while also allowing their clients to choose from a variety of architectural styles, materials, colours, and configurations for buildings. This allows for retention of desired appearances while dissociating design decisions from construction decisions.

The Bid Package is Where Good Ideas Become Buildable

Visually appealing concepts don’t give contractors enough information to prepare reliable bids. They need clear drawings, material specifications along with construction information, as well as a defined scope of work.

The most effective park bathroom designers recognize that documentation is essential in order to take a design from the initial planning phase to the procurement.

Romtec provides design drawings along with specifications and renderings to be used in bid packages. Engineered plans and supporting submissions aid in the construction process following project acceptance. The coordination of documents is crucial for public owners as it reduces the confusion of what they should expect from contractors.

Prefabricated doesn’t always mean better.

How the building is delivered to the site of construction is an important aspect that makes a difference. Some prefabricated structures are largely assembled. Romtec generally employs a unique method, which is to provide construction materials kits and plans for building on the project site.

Site-built construction can accommodate special architectural features, standard concrete foundations, and materials familiar to local contractors. Romtec can accommodate tilt-up components as well as set-in place construction, as well as prefabrication in part.

A contractor who works on park restrooms must be able, rather than offering a single solution and explain the most effective design and construction process for the project taking into account the location, design and budget.

Keep the Project Team in touch

The construction of public parks involves many participants each with their own roles. Landscape architects are responsible for the overall concept of the park. Engineers are in charge of addressing technical requirements. Contractors are responsible for construction, whereas owners must think about financing and approvals as well as long-term operation.

Unnecessary revisions can be caused because of a lack in communication between the groups. Romtec offers the design, material, documentation and optional turnkey installation services to help with projects.

The company’s knowledge extends beyond concessions buildings and restrooms to include shelters, pavilions and other structures for public recreation.

Early coordination is essential to a successful start

The most efficient time to address details regarding construction is prior to when they become expensive changes. Owners should confirm design expectations and be aware of proposed construction techniques and create requirements for the construction documents while the project remains flexible.

A gorgeous park is attractive, but it’s not enough for success.

When architectural creativity is supported by concrete engineering, clear specifications and coordinated construction planning, communities are better equipped to design public spaces that achieve their goals and serve visitors for many years to be.